国产一级免费电影,国产自产在线视频一区,国产一区亚洲,久久国产精品视频,日本美女天天操b,九色激情,成年轻人网站色直接看

1,500 workers complete railway line upgrade in just 8.5 hours

Source: Xinhua| 2018-01-23 18:23:02|Editor: Liu
Video PlayerClose

Workers work on the construction site of Longyan railway station to join three existing railways to a new railway linking Nanping and Longyan in Longyan City of southeast China's Fujian Province, Jan. 19, 2018. The project, involving 1,500 workers, is completed in less than 9 hours. The 246.55 km-long Nanping-Longyan railway, designed to run at a speed of 200 km per hour, is a part of the plan to improve the local transportation system. (Xinhua/Song Weiwei)

FUZHOU, Jan. 23 (Xinhua) -- In just eight and a half hours, over 1,500 workers completed the installation of a new railway line as part of a train station upgrade in east China's Fujian Province.

Construction began at 6:30 p.m. Friday and by 3 a.m. Saturday, workers had completed the removal of old tracks, the laying of new tracks, and the installation of railroad switches at the station in the city of Longyan.

Seven trains and 23 excavators were used in the project.

The train station was upgraded to connect a newly-built line with three existing railway lines.

The newly-built line, linking Longyan with the city of Nanping in mountainous western Fujian, will begin operation at the end of 2018.

With a maximum designed speed of 200 kilometers per hour, the high-speed rail line will cut the travel time between the two cities from seven hours to just 90 minutes.

The 246 km Nanping-Longyan railway line will include stops in Shaxian, Sanming, Yong'an, and Zhangping.

Previously, three railway lines, namely Ganzhou-Longyan, Ganzhou-Ruijin-Longyan and Zhangping-Longchuan, passed through Longyan.

Once operation begins, the new railway line will further integrate the less developed part of Fujian with the cities of Beijing, Shanghai and Guangdong.

   1 2 3 4 Next  

KEY WORDS: railway
EXPLORE XINHUANET
010020070750000000000000011100851369183191